Quality PTM
37_REQ2025055829
Obowiązki
Wymagania
Respect of build In Quality Standards: SPPC tracking sheet is used – SPPC identification procedure is respected – SPPC transfer to Supplier via the VRFs
Challenge other PTM on their activities
Oferujemy
Ensure that novelty on product and process are taken into account in DFMEA, PFMEA, DV&PV
Verify LLCs have been used in the D/P FMEA to reduce RPN and respected
After design freeze, ensure 4M matrix respect with regards product or process changes and ensure customer awareness and approval of changes in accordance with the 4M matrix
Update the quality documents following a product / process related change
Participate to Design Reviews, including suppliers and tool makers design review
Perform the revision of the control plan after an issue and / or after test results
Źródło: Valeo/Praca